Mercurial > docs > diploma
view reports/weekly-report_2008W40.txt @ 167:74151e26ba6a
this is the correct message for the last commit
I really hate it when I check in too early or too much by accident!
Maybe I should add a confirmation there to prevent me from doing stupid things.
But now what I checked in with the last commit:
- titlepage became the real titlepage, specifying all important info
- cover became the real cover to be the very first page
- the previous cover became pretitle, and moved between the other two
- my confirmation that I wrote the thesis on my own moved to the appendix
- the abstract and keywords moved to the back of the pretitle
- the copyright information extended
- the market share table is in a temporary state! (Needs verification!)
- some cleanups
Ten small commits instead of this huge one with an afterwards added message
are what I intended ... now I am in a bad mood because of this mess :-(
author | meillo@marmaro.de |
---|---|
date | Fri, 19 Dec 2008 20:36:03 +0100 |
parents | 7a453fce0961 |
children |
line wrap: on
line source
Date: Sun, 12 Oct 2008 22:17:57 +0200 From: markus schnalke <meillo@marmaro.de> To: "Prof. Schaeffter" <schaeffter@hs-ulm.de> Subject: weekly report for 2008W40 Message-ID: <20081012201757.GL21850@serveme.schnalke.local> MIME-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Disposition: inline User-Agent: Mutt/1.5.13 (2006-08-11) Status: RO Content-Length: 962 Hello, this is the third weekly report. Plans for this week: * dig deeper in ``real content'' (DONE) * write some intro texts (DONE) * read masqmail code (MISS) * learn basic structure of masqmail and write about it (MISS) * get in contact with people who use(d) masqmail (PARTLY) What I did this week: * researched about history of masqmail and wrote about it * uploaded fixed Debian package of masqmail * emailed Oliver related to history of masqmail * reworked structure of thesis * made a lot of thoughts about structure * collected information for MTA comparison Summary: * have not really done what was planned, but that's okay * did stuff that mattered * masqmail code observation is moved to later * it was good to think about structure Plans for next week: * write more texts * have a look at other MTAs * think more about structure * think about time management * focus on getting one part finished I'll work next week in Italy :-) markus