docs/diploma

annotate thesis/input/masqmail-sloccount.txt @ 285:391793afb4cb

itemize -> enumerate at some places
author meillo@marmaro.de
date Thu, 15 Jan 2009 22:45:51 +0100
parents
children
rev   line source
meillo@278 1 Total Physical Source Lines of Code (SLOC) = 9,041
meillo@278 2 Development Effort Estimate, Person-Years (Person-Months) = 2.02 (24.22)
meillo@278 3 (Basic COCOMO model, Person-Months = 2.4 * (KSLOC**1.05))
meillo@278 4 Schedule Estimate, Years (Months) = 0.70 (8.39)
meillo@278 5 (Basic COCOMO model, Months = 2.5 * (person-months**0.38))
meillo@278 6 Estimated Average Number of Developers (Effort/Schedule) = 2.89
meillo@278 7 Total Estimated Cost to Develop = $ 272,690
meillo@278 8 (average salary = $56,286/year, overhead = 2.40).
meillo@278 9 SLOCCount, Copyright (C) 2001-2004 David A. Wheeler